Green Dragon Hotel
Improved Pump efficiency for a historic building
Project : Plant Room Control System
Client : The Green Dragon
The Green Dragon Hotel is based in Hereford, the Hotel is one of the oldest hotels in Britain, with roots dating back more than 900 years to an inn on this site, owned by the Bishops of Hereford, called the White Lyon.
After a prolonged period of repeated ownership changes, underinvestment and neglect, a group of Herefordshire investors came together in mid-2018 to acquire and refurbish the Green Dragon Hotel, to honour its remarkable history and to create a platform for Herefordshire’s thriving independent food and drink producers.
Arnold was called upon to apply its electrical experience in electrical control to the refurbishment. Dealing with a very old building a new Control Panel needed to be designed for the plant room for better efficiency and control to remove the element of down time from old faulty switch gear and an absence of no reporting and maintenance notifications.
With this building it was not just the case of providing a simple control panel, thought and design had to go in to finding a balance of ensuring new applications did not damage or cause faults with old applications and with our wealth of experience in electrical control and Plant Room mechanics and pumping solutions Green Dragon befitted in this way as they were able to draw from our experience.
The Green Dragon Hotel is now up and running, fully refurbished and taking in customers and The Green Dragon is able to have peace of mind that there Plant Room will not cause drastic down time causing un happy clients from no wot water and heating.
As well as the plant room The Green Dragon uses us for other electrical break downs and maintenance knowing we are on hand 24 Hours a day for when disaster strikes
Check Out related links
More Recent Project
Control Soloutions we can provide